PalestineRemembered.com Satellite View Search Donate Contact Us النسخة العربية
Home Pictures Maps Oral History Zionist FAQ Zionist Quotes The Conflict 101 R.O.R. 101 Site Members About Us
Communication in Palestine: Railways before Nakba: Supplementing Volume II, Chapter XX, Pages 853-872, British Mandate: A Survey of Palestine: Supplement - Page 111
Post Your Comment  (1 comment

eMail
Print

Return To Survey of Palestine
כדילתרגם לעברית
Posted on October 28, 2007
Previous Page   Next Page
Click to enlarge
Previous Page

British Mandate: A Survey of Palestine
Click here to purchase a copy of this book.

Next Page
Disclaimer

The above documents, article, interviews, movies, podcasts, or stories reflects solely the research and opinions of its authors. PalestineRemembered.com makes its best effort to validate its contents.


Return To Survey of Palestine
 

Post Your Comment

Posted by Webmaster on June 16, 2013 #151484

COMMUNICATIONS.

Supplementing Volume II, Chapter XX, pages 853-872.

RAILWAYS .*

(p. 854) (§ 7)

The tonnage of goods conveyed by the Palestine Railways and the net ton-kilometres run during the past two years were as follows:-

I Tonnage of goods conveyed I Net ton- kilometres

Year Total all Tons I Tons Standard 1105 ems, I Total

sources imported exported gauge gauge

~12.157,759 I 381.872 I 259,137 /351,846,000 I 21.907,000 I 373,753,000

1946/47 1,772,662 228,611 67,093 271,985,000 13,873,000 285,858,000

The average haul on The standard gauge and 105 ems. gauge in Palestine is 110 and 70 kilometres respectively.

With the cessation of hostilities, military traffic decreased, and the total tonnages conveyed by rail have since 1944/ 45 been steadily on the decrease. Conditions were worsened by the emergence towards the end of 1945/46 of political unrest and by the concentration from that date of systematic and relentless sabotage against the Railway. Sabotage has inflicted considerable damage on railway track, buildings and rolling stock and has resulted in intermittent dislocations of work and scheduled services; it has necessitated the introduction of a system of military protection by patrol and armored rail trolleys, and the restriction of train services, on security grounds, to daylight. It has been necessary as a result of such restriction to concentrate a normal 24-hour service into a period of about l 2 hours and although it has been found possible in the circumstances to convey the tonnage offering, the operating results of the railway have been seriously affected and its ability, as a commercial undertaking, to run goods services, seriously handicapped.

(p. 855) (§ 9)

The comparison of pre-war expenditure and revenue with those of recent years is given below for all sections of the Palestine Railways administration :-

Page 111